Facility Systems

Power Unit and Generator Enclosures

Power Unit and Generator Enclosures are custom configured to suit customer requirements using pre-engineered acoustic wall and ceiling panels, doors and silencers. Design features consider access, cooling and aerodynamic requirements to optimize airflow and prevent recirculation. Access issues are addressed by incorporating removable hatches, wall and ceiling panels. Units are weather proof as required.

Modular units can be configured with factory installed electrical systems, lighting systems, fire systems, damper and fan systems designed to meet customer requirements

Control Rooms

Control Rooms are custom configured to suit customer requirements using pre-engineered acoustic wall and ceiling panels, doors, windows and silencers. Features offered include bullet resistant glass, isolated floors, access panels, removable wall and ceiling panels.

As required modular units can have factory installed computer and raised floor systems, electrical and lighting systems and HVAC systems designed to meet customer requirements.

Ancillary Systems

Ancillary Systems for fuel, water and compressed air services are provided to support equipment requirements for testing or remote operational requirements. These can be configured as packaged modules on skids or containerized, to enable pre-delivery testing and commissioning and faster transportation, site set-up and final commissioning. Modular systems also allow for less complex relocation requirements.

Modular Systems

Systems can be configured as modules to enable easy transportation, system expansion, fast site set-up and relocation. Modular systems enable assembly and testing to be achieved in a controlled environment prior to delivery; to significantly reduce costs associated with the time normally required for assembly of components at site.

Demountable Systems

Demountable Systems can be configured from standard components that are manufactured and finished for easy installation at site. Systems are fully developed and parts identified, packed and shipped to enable the planned assembly at site to be straight forward. The methods of assembly enable the system to be dismantled and reused in the same configuration or used as applicable for another requirement without a total loss of investment where used for temporary locations.