Aviation

Ancillary Systems

Ancillary Systems for fuel, water and compressed air services are provided to support equipment requirements for testing or remote operational requirements. These can be configured as packaged modules on skids or containerized, to enable pre-delivery testing and commissioning and faster transportation, site set-up and final commissioning. Modular systems also allow for less complex relocation requirements.

Control Rooms

Control Rooms are custom configured to suit customer requirements using pre-engineered acoustic wall and ceiling panels, doors, windows and silencers. Features offered include bullet resistant glass, isolated floors, access panels, removable wall and ceiling panels. As required modular units can have factory installed computer and raised floor systems, electrical and lighting systems and HVAC systems designed to meet customer requirements

Recent Projects - Aviation

Essential Facility Systems LLC is the US representative for Magnus Engineering & Maintenance Ltd. designed systems. Recent Projects completed by Magnus Engineering include:
Commercial Engine Test Cell Upgrade and Integration

Project Description:
Upgrade of the Engine/Facility Control and Monitoring System; supply and installation of a new Computerized Data Acquisition System for the CFM56-2/3/5/7 series engines.

  • The scope of the work included the following:
  • Data Acquisition System and self-test station
  • Consultant for auxiliary systems upgrade
  • Integration of new to existing systems
  • Project Management
  • Design Review
  • Documentation
  • Training
  • Warranty

Commercial Engine Test Cell Upgrade and Integration
Project Description:
Upgrade of the Engine/Facility Control and Monitoring System; supply, installation and integration of a new Computerized Data Acquisition System for CFM56-2/3/5/7, JT8D-200, PW4000, V2500, JT3D, JT9D-7R4/ G2/ 7Q/ 7F/ 7A/ 7J.

The scope of work included the following:

  • Consultant for auxiliary systems upgrade
  • Data Acquisition System self-test station at Engine Preparation Area
  • Integration of new to existing systems
  • Project Management
  • Design Review
  • Documentation
  • Training
  • Warranty

T64/T700 Engines Test Cell
Project Description:
Turn-Key project for design, development, manufacture, construction, installation, acceptance testing and calibration of a new Duel Engine Test Cell for T-700 and T-64 turbo-shaft engines..

The scope of the project covered the following:

  • Site analysis Foundations and Construction
  • Test Cell Building
  • Engine / Facility Control and Monitoring System
  • Computerized Data Acquisition System
  • Fuel System
  • Starter Air System
  • Compressed Air System
  • Dynamometer Water Cooling System
  • Oil Preservation System
  • Electrical System
  • Lighting System (External, Internal, Emergency)
  • Septic / Sewage
  • CCTV
  • Communication System
  • Documentation
  • Design Reviews
  • Program Management
  • Training
  • Warranty

PT6 / T700 Engines Test Cell
Project Description:
Upgrade of the Engine / Facility Control and Monitoring System: Supply, installation and integration of a new Computerized Data Acquisition and Software System for PT6 / T700 Series Engines.

In addition to the above, the scope of the work included the following:

  • Engine / Facility Control and Monitoring System
  • Computerized Data Acquisition System
  • Integration
  • Design Review
  • Documentation
  • Training
  • Warranty